N
notoriouseddie
So ive spent the best part of my weekend trying to solve this with no luck.
Recently purchased a Grohle Rapid SL 0.82 wall mounted cistern and a compatible toilet from another company. The steel frame was mounted without too much grief but I cant get the pan to be firmly secured to the frame.
The problem seems to come from two misterious black rubber connectors which im either using incorrectly or are the wrong parts. It appears that they are meant to go into the two holes at the back of the toilet and screw up with the metal rod that goes into the frame. The metal rods are solid when they are screwed into the frame but the connection between the rods and the pan via these black connector is completely flimsy at best!
Im at my wits end with this - Any advise would really be appreciated.
P.S. Ive not done any plasterboarding or tiling over the cistern yet as I wanted to do a dummy run first




Recently purchased a Grohle Rapid SL 0.82 wall mounted cistern and a compatible toilet from another company. The steel frame was mounted without too much grief but I cant get the pan to be firmly secured to the frame.
The problem seems to come from two misterious black rubber connectors which im either using incorrectly or are the wrong parts. It appears that they are meant to go into the two holes at the back of the toilet and screw up with the metal rod that goes into the frame. The metal rods are solid when they are screwed into the frame but the connection between the rods and the pan via these black connector is completely flimsy at best!
Im at my wits end with this - Any advise would really be appreciated.
P.S. Ive not done any plasterboarding or tiling over the cistern yet as I wanted to do a dummy run first




Last edited by a moderator: