I have drilled my new hole for the stack and it aligns almost perfectly with the horizontal 22mm copper gas pipe further along the wall.
So i think i will clash with this pipe even if i put a slightly steeper fall on it.
What do i do in this situation. The only idea i have is to have the bend pointing downwards and then run a short length of soil pipe vertical, then put another bend on the end to take it in the direction of the stack.
Any better ideas ?
So i think i will clash with this pipe even if i put a slightly steeper fall on it.
What do i do in this situation. The only idea i have is to have the bend pointing downwards and then run a short length of soil pipe vertical, then put another bend on the end to take it in the direction of the stack.