Hi

I have recently employed a property development firm to completely renovate my bathroom. It is a very long story but I have summarised my growing concerns below:
  • Initially they were fine until I signed up and paid 50% deposit.
  • Since then they have been really poor with communication and very rarely reply back to my emails/texts and when they do it never actually answers all my queries.
  • They kept stating an electrician would come out before works started for an assessment and he never turned up and they have never clarified why.
  • Their supplier for the bathroom suite stated our choices were in budget then the quote can back 32% over budget.
  • They have now this week started work and I am very concerned with their behaviour as I don't have any expertise to check their handy work at the moment but the mess and some damage they have left is concerning.
  • We put our own carpet protection down and they stated they would be with us at 9 a.m. and turned up at 12 noon and just before turning up stated that they needed a large space for all their tools to be stored in the house, we only have a small terraced house so we accommodated where possible and they put carpet protection down in our spare bedroom.
  • The next day they stated they would arrive between 8 a.m. - 9 a.m. and arrived 11:30 a.m. with no explanation.
  • The 2nd day (yesterday) was the most concerning as they have caused some minor paint damage in our spare bedroom and our hallway/stairs/landing. They have taken over the whole spare bedroom without us giving them permission and not put carpet protection down in those new areas. They have dumped the tiles/grout/plaster/adhesive/whole bathroom suite in our house even though it is nowhere near ready for them to use/install yet. They have left mess everywhere and never cleaned up and some of the plaster bags were split and leaking on the floor (which was protected) but all you could smell in the air when I came home was plaster and they just left the bags leaking.
  • They come late (so far never before 11:30 a.m.) and have never stayed beyond 4:30 p.m. yet.
  • One of their labourers allegedly got a minor electric shock and they now want us to pay their electrician for an extended check which I completely understand but don't trust if their concerns are genuine.

They are checkatrade registered, Which registered, and trading standards registered and have very good reviews on those websites which is what we went on. However I have checked the terms and conditions for each of these sites regarding a whole multitude of areas they have not adhered to what they are supposed to regarding when they are attending, deposit being protected, treating us and our home with respect, cancellation notices, amending quotes, etc.

I am at the point now where I am seriously stressed and concerned and wondered if anyone could give any advice or share experiences to help us?

Thanks
 
As described, this does not seem to demonstrate good practice in a number of ways.I would be concerned about the future of the job after such a poor start.I am interested in the point you made about sending out an electrician to assess the job and him not turning up.You then have someone getting a minor shock and wanting you to pay for an additional check.would this be the same electrician who didn't turn up,no explanation?!!!The bathroom fitments cost changing is not good.You are clearly having doubts about this job, but having paid 50% up front and signed a contract it looks like you might have to make the best of it.I don't know if you have anyone who can assist you as no one like a confrontation.I would want to sit down with whoever is in charge of this project,state clearly your concerns,remind them clearly that you are the customer and you expect yourself and the property to be treated with respect.

Another interesting thing coming out of your post is that they are registered and supposedly verified by various organisations.People are asked to believe in this and use it as a basis for giving work.Like a lot of people on here I belong to none of these and I am happy to give checkable references and allow my work to be seen.Good luck and keep in touch.
 
I would be taking photo's of all the work done that won't be visible after the bathroom has been completed.

I would also question why the work doesn't start until midday.
I bet they turn up work for a bit and have lunch.
You're getting about 4 hours of productivity a day.

I would assume these guys are subbies - no one could afford to have them on wages.
Ask that question also - employees or sub-contractors.

If sub-contractors - ask who provides the warranty on works done.
( I bet it's not the company you employed to do the work )
 
Thank you for the replies.

I did have a good chat with the owner of the company who is my main contact and I explained all my concerns. He was very approachable and did apologise and gave me some explanations that have put my mind better at ease.

The electrician has come out now and the minor electric shock was due to previous owners of the property having put the earth wire on a painted pipe and obviously paint doesn't conduct so the electrician moved it to the copper part of the pipe. The electrician seemed very good and was very chatty and explained a lot of stuff to us. He has now fitted the lights and the extractor fan and just has a few more bits to do later this week.

I have taken photos of the concerns I have so far but the actual workmanship is a bit more difficult as a novice to understand if there should be concerns with what I am seeing. Nothing obvious looks a problem.

The only subbie is the electrician as the other staff are employed via the company direct. The issue appears to have been that they have had a big job overrun and didn't tell me so when they indicated they were coming to see us they were actually going to the other place and finishing up.

They have turned up early today and it appears the other job has now finished so hopefully we will be getting value for money now.

The 12 month guarantee we have is direct with the company based on the quote given.

At the moment I'm much more confident with the company due to clear the air talks so just hope that better practices now occur. They do seem to be on track time wise so I hope the issues we have had have been teething problems.

Just wanted to say thanks for the comments as it does make a difference when you are going through these problems to have people commenting and giving their opinions and help.
 
Last edited:
I am glad the situation is not as bleak as it appeared and that you are feeling more comfortable about the situation.It would seem that poor communication/organisation has been a major issue.I am glad you followed my advice and sat down with the person in charge.Don't be afraid to show interest in the job and ask Q's without being a 'busybody'.
I have found it a good idea on bigger/more complicated jobs that at the first meeting prior to quoting, I spend as long as needed explaining in detail approx.time required,what is possible,various options etc.The quote is based on this and customers know what they are getting for their money.Anything which crops up during the work is dealt with.This makes the job much easier for both parties.
On specifics,did you resolve the additional 30% cost and get them to be as tidy as possible.Glad the electrical problem was resolved easily.Without hopefully not worrying you further.Tiling will be the key to how your bathroom looks.There is the idea among non-tilers and builders of 'How hard can it be to stick a tile on a wall?' There is a whole tilers forum devoted to this skill and the many examples of bad tiling submitted by disappointed customers.Briefly no PVA before tilling ,no dot and dabbing when tiling.Hope all goes well.
 
Last edited:
Yeah the lack of communication seems to have been the main concern and he did admit that they are very de-sensitized when it comes to these jobs and the effects it can have on the customer. As we haven't had much work done previously I think our lack of previous experience has also had an impact.

I think as we are quite 'nervous' customers we really just needed some care and attention which hopefully now we will get.

With regards to the extra costs on the bathroom suite the provider couldn't offer any deal other than we downgraded components which we didn't want to do as had planned everything out on what we had chosen. The contractor has agreed to provide the extractor fan free of charge to bring the cost down a bit so it is a least nearer to what our budget was. I am unhappy with the provider as we made it clear our budget wasn't really negotiable.

Yeah I'm hopeful with the tiling as they do seem to be very conscientious at least with their workmanship even if at times their cleanliness to other parts of the house hasn't been to my standards. So far in the tiling regards they have said all the right things so time will tell.

Thank you for replying further it does help especially as you are a professional yourself.
 
Did the spark give you a reason why electricity was going to earth (normally there's a fault) as make sure hes qulified ask for his card (like the gas safe card to show he's qulified)

Any chance of a few pics ?
 
I'm not entirely sure but they were doing a lot of work with the electrics at the time and were getting them all ready for the electrician and taking out the old electric shower, etc.

I haven't got any pics of that unfortunately and I haven't seen any qualifications but he does work full time as an electrician for another firm.

An update on a slightly different subject is that we are going to have to pay out more as when they have taken the flooring up some of the old pipes (which look original to the property) are weeping so they have recommended they are replaced with plastic pipes as a precaution (these are the hot/cold water pipes). They have also recommended that new flooring is put down as the original is so uneven.
 
I'm not entirely sure but they were doing a lot of work with the electrics at the time and were getting them all ready for the electrician and taking out the old electric shower, etc.

I haven't got any pics of that unfortunately and I haven't seen any qualifications but he does work full time as an electrician for another firm.

An update on a slightly different subject is that we are going to have to pay out more as when they have taken the flooring up some of the old pipes (which look original to the property) are weeping so they have recommended they are replaced with plastic pipes as a precaution (these are the hot/cold water pipes). They have also recommended that new flooring is put down as the original is so uneven.

Get them to replace in copper and not plastic and tbh all there work should be in copper
 
From speaking to them they have said that most things are now plastic as it is safer and they are adamant that this is the best way forward to make sure that the piping is secure and safe.

Hard for me to insist any further really, do you think that plastic will be safe though?
 
From speaking to them they have said that most things are now plastic as it is safer and they are adamant that this is the best way forward to make sure that the piping is secure and safe.

Hard for me to insist any further really, do you think that plastic will be safe though?

Safer no and as long as they do it properly and use all the fittings and inserts and won't rub on anything should be ok
 
If it helps reduce your stress level, most if not all new housing estates are done in plastic nowadays.

Not saying it`s right or wrong way as don`t want to enter the Plastic v Copper argument.
 
Thanks for the reply, they seem to be fitting everything so it looks ok but obviously I'm no expert.

Hopefully it will make those pipes secure and updated and then they are going to put something like marine ply down with levelling solution or something to get the floor as level as possible so that the floor tiles will look as good as they can get them.
 
Thanks rpm, our builders were adamant that they feel plastic is now the done thing and they feel is better. I guess as per ShaunCorbs the main thing is that it is all fitted properly.
 
Thanks for the reply, they seem to be fitting everything so it looks ok but obviously I'm no expert.

Hopefully it will make those pipes secure and updated and then they are going to put something like marine ply down with levelling solution or something to get the floor as level as possible so that the floor tiles will look as good as they can get them.

Floor tiles upstairs if so hope they put a no cracking matting down before tiles
 
Status
Not open for further replies.

Reply to Bathroom Renovation Concerns, Help Please! in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock