got a job in the morning inspecting the plumbing on a big new extension job.
apparently the customer is complaining of leaks all over the installation. the contractor says the first fix plumber did do a good job with the install but is not too confident on second fix.
according to the contractor, he is saying the customer is a right awkward pig and is causing leaks by tampering with the supplies and drainage. he wants me to do a full inspection of the job to determine if the install is correct, not tampered with and make it tamper proof. he has also asked if i can pressure check the drainage but cant see how to do that after 2nd fix to soils?
what and how would you conduct this inspection of waste and supplies when everything is installed?.
how would you 'mark' every connection to proove tampering has taken place?.
bit of a weird one for me past the obvious leak checks, any ideas appreciated.:icon10:
apparently the customer is complaining of leaks all over the installation. the contractor says the first fix plumber did do a good job with the install but is not too confident on second fix.
according to the contractor, he is saying the customer is a right awkward pig and is causing leaks by tampering with the supplies and drainage. he wants me to do a full inspection of the job to determine if the install is correct, not tampered with and make it tamper proof. he has also asked if i can pressure check the drainage but cant see how to do that after 2nd fix to soils?
what and how would you conduct this inspection of waste and supplies when everything is installed?.
how would you 'mark' every connection to proove tampering has taken place?.
bit of a weird one for me past the obvious leak checks, any ideas appreciated.:icon10: