Discuss .......Lagging....... in the Plumbing Jobs | The Job-board area at PlumbersForums.net

ShaunCorbs

Super Moderator
Staff member
S. Mod
Plumber
Gas Engineer
Subscribed
Messages
34,377
Solutions
2
does anyone else find it satisfying and some enjoyment

yes i know its not 100% but its hard macthing up 28-22-15

B0B6DEC9-4C5F-41CE-B04E-02FD76ECD376.jpeg
 
If that’s your install, I’m very very impressed with the quality of your work.
Insulation is a very time consuming job, but is the cherry on top when done well.


Love the tundish....... I mean hopper:D
 
Yep my install

Got the scares off that drain off to prove it why gledhill did you install the cold inlet 1/3 the way up the cylinder feel sorry for the next guy whose got to remove it with 100l ish left
 
If that’s your install, I’m very very impressed with the quality of your work.
Insulation is a very time consuming job, but is the cherry on top when done well.


Love the tundish... I mean hopper:D

Was cheap think around the £5 mark makes it easier to terminate don’t just stuff them in a piece of 11/4
 
Not having that you paid that price for it?

For the lagger I paid slightly more as was one of the first ones to get it

Don’t buy the pro kit eg the saw it’s crud can’t get on with it too wide
 

Reply to .......Lagging....... in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock