The pipe was there in 22 before. This job was a dud from the start.Sparky will be whingeing that the pipes in a cable zone.
My first thought was get the cutters out.The pipe was there in 22 before. This job was a dud from the start.
35kw Main boiler on site before I started with horizontal flue.
Would have got away with 22mm if he'd got a 30Kw, would have benefited from rear piping on a baxi and flue going through roof vertically.
This is a perfect example for why you get the engineer to spec the parts and materials as he's saved no money and lost on aesthetic and warranty.
It was a favour just for me to do the boiler!