- Messages
- 650
Basically after a bit if advice really. Monday to Friday I work on site for a for a Plumbing company and then do my own little jobs on an evening or weekend, this means I've never had the need to write out contracts for work to be done or estimates.
I'm going to be pricing up a job to do all of the plumbing and gas in a brand new house soon so would it be best for a written estimate and then contract if I was to get the job and if so what should be in them both and does anyone have a draft of one they use the selfs or something like that,
cheers
I'm going to be pricing up a job to do all of the plumbing and gas in a brand new house soon so would it be best for a written estimate and then contract if I was to get the job and if so what should be in them both and does anyone have a draft of one they use the selfs or something like that,
cheers