Discuss 3 month old grant job, what a mess. in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
Looks a lot over the maximum flue length, including 90 off boiler, additional 90 & 2x45... Defs not enough fall, hence water pooling in flue & leaking through seals!
i dont think you have to allow for the 90 on the boiler thats counted as part of the boiler im sure the measurements are from the outlet of that bend
 
Status
Not open for further replies.

Reply to 3 month old grant job, what a mess. in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock