So, Chuck votes I sack him, Shaun votes I give him a chance to put things right. So far it's a tie!
I'll see how responsive he is to the idea of rectifying things and then guess I'll go from there, as generally speaking he has been quite willing to listen and do what I've asked. Having said that, I should point out that one of the things I asked him to do was reinforce the joists where he was cutting holes - if I hadn't asked him to he wouldn't have done that, so perhaps that's not a good sign either?
Another issue I have is where the pipes clash with the shower trap... instead of re-running the pipes to avoid this, which may have needed another small notch, he chose instead to cut out one massive notch! As it's now covered I can see how deep it goes, but I'd guess from the photo it's easily 50% of the joist height!
I'll see how responsive he is to the idea of rectifying things and then guess I'll go from there, as generally speaking he has been quite willing to listen and do what I've asked. Having said that, I should point out that one of the things I asked him to do was reinforce the joists where he was cutting holes - if I hadn't asked him to he wouldn't have done that, so perhaps that's not a good sign either?
Another issue I have is where the pipes clash with the shower trap... instead of re-running the pipes to avoid this, which may have needed another small notch, he chose instead to cut out one massive notch! As it's now covered I can see how deep it goes, but I'd guess from the photo it's easily 50% of the joist height!