Yep correct (you are)
Should be waterproof plasterboard, tanking then wet panel wall with final seal etc
At the absolute minimum waterproof plasterboard, silicone tray to wall then wet panel wall and final seal
Yep common getting...
They want the pipe moving a bit and also that kink getting rid of. Which, having looked at again defo really looks like a copper kink? My plan is to chip / dig away some of the floor to get access to a good bit of pipe below that kink...
Would say 90% it’s copper as if plastic had that kink on it would of split by now / bubble
Pair of grips to see if it’s got any play eg if plastic should squeeze a bit if copper won’t etc without denying etc
Obviously it's been off quite a while, but just called for heat and got hot straight away, so don't think its a problem.
Btw, same happens at hot taps as well as shower, so not just the shower, that's prob obvious but thought I'd...
Sounds like the pump isn’t able to pump anything maybe blocked outlet
Might be best to look where it terminates to
Also should be level left to right not sagging down to the right (you tried levelling it to see maybe if the float...
Towel rails are notorious for being bad quality steel so even on the cleanest of system they still dirty, I think it’s down to there height let’s air build up there and air - steel - water bad mix
Noticed this hasn’t been updated/ posted in a while so a bit of a photo dump from me
New system 19 rads boilers existing everything else new
Serviced yearly supposedly 😂 (filter),
Worcester camarey another one serviced yearly...
It’s worrying that engineers don’t carry simple van stock items
There not special items any decent oil engineer should carry both
Nozzle should be listed on the data plate on the right hand side eg by condense trap unless increased...
Can’t understand why we can’t go down the permit route and use building control as inspectors will give more a job also hopefully would cut down on any problem/ unregistered installs as everything would be traceable
Yes normally find the condense is backing up slightly / boiler tilted the wrong way causing a drip onto the blast tube
Grinder and a wire wheel sorts them out
In theory yes
And yes but there no common terminal so there has to be a link inside you can test put live and neutral to the stat
Turn stat on eg you want heating / call you should get 240v on one of the terminals (with a...