Hi there. I’m currently basically re plumbing my downstairs having already done most of the upstairs.
Valiant 35kw boiler in the loft
CH F + R both exit in 22mm
TEEs off to feed upstairs inside loft
Otherwise F+R head straight vertically down through middle of the house (22mm)
So im about to pipe up for the downstairs, and I need to go rearwards for x2 vertical rads, and to the front for a vertical and a standard. My question is basically, do I Tee the F and R at the bottom of the vertical pipes, or use a 90 degree and make a loop around the downstairs instead? Will it matter? Obviously from a fluid dynamics POV, Tees arnt great but will the system even care?
Thanks
Valiant 35kw boiler in the loft
CH F + R both exit in 22mm
TEEs off to feed upstairs inside loft
Otherwise F+R head straight vertically down through middle of the house (22mm)
So im about to pipe up for the downstairs, and I need to go rearwards for x2 vertical rads, and to the front for a vertical and a standard. My question is basically, do I Tee the F and R at the bottom of the vertical pipes, or use a 90 degree and make a loop around the downstairs instead? Will it matter? Obviously from a fluid dynamics POV, Tees arnt great but will the system even care?
Thanks