Hello guys & gals,
I am quoting a floor standing boiler replacement, the heating is pumped with cylinder on gravity flow & return with the usual 22 vent on flow & 15 cold feed into return (on cylinder).
All the flow & returns go back to the boiler, but when i fit a wall mounted regular boiler with pumped Y plan system, im just wondering wether I would have "pumping over" issues, there no way of getting the vent & feed before the pump like an ideal system design, and customer does not want a sealed system either. (pipes in concrete floor!)
Is there a way a re-arranging the cold feed & vent in airing cupboard so its okay, or would it not pump over anyway?...
Any advice appreciated, I am used to upgrading to sealed sytems than modifying tank fed!
I am quoting a floor standing boiler replacement, the heating is pumped with cylinder on gravity flow & return with the usual 22 vent on flow & 15 cold feed into return (on cylinder).
All the flow & returns go back to the boiler, but when i fit a wall mounted regular boiler with pumped Y plan system, im just wondering wether I would have "pumping over" issues, there no way of getting the vent & feed before the pump like an ideal system design, and customer does not want a sealed system either. (pipes in concrete floor!)
Is there a way a re-arranging the cold feed & vent in airing cupboard so its okay, or would it not pump over anyway?...
Any advice appreciated, I am used to upgrading to sealed sytems than modifying tank fed!