P
Plucky
Anyone got any ideas on the above.
Situation is I have to replace a bath with shower tray for elderly customer and unfortunately the existing waste is a little higher than I would like so rather than have an upstand into the shower I wanted to boss a new pipe in lower and cap off the old existing copper waste.
The stack is internal and boxed in. I will break out to gain some access but removing a section and replacing with plastic is not an option.
Thanks
Situation is I have to replace a bath with shower tray for elderly customer and unfortunately the existing waste is a little higher than I would like so rather than have an upstand into the shower I wanted to boss a new pipe in lower and cap off the old existing copper waste.
The stack is internal and boxed in. I will break out to gain some access but removing a section and replacing with plastic is not an option.
Thanks