G
GBZ
I've been asked by a local school to replace 3 toilets. Ideally, however, they want only 2 to be operative and have the 3rd one capped off.They all feed into the same main waste pipe, although have individual feed pipes. Toilets currently flush vertically down into the soil pipe.Any ideas?Keith