hi all
i have a large accomodation builing which is heated by a 2 inch pipe all the way around rooms and uses aluminum fins in the rooms to dispate the heat.
the problem is i have two ground floor corridoors cold and hot at each end of the repspective corridoor and only have a radiator type belld point above a door so i cannot drain down loops back to a district heating main. 3/4 of building hot ideas to shift please
thank you in advance
two drain points for first floor hot
i have a large accomodation builing which is heated by a 2 inch pipe all the way around rooms and uses aluminum fins in the rooms to dispate the heat.
the problem is i have two ground floor corridoors cold and hot at each end of the repspective corridoor and only have a radiator type belld point above a door so i cannot drain down loops back to a district heating main. 3/4 of building hot ideas to shift please
thank you in advance
two drain points for first floor hot