krav965
Hi, just down the gas pipe calculations on a worcester bosch 28i junior combi a work buddy is fitting and it has posed a question...the boiler requires a rate of 3.02m cubed /hr.the existing gas supply pipework is made up of 3mtrs 15mm and 1.5 mtrs 22 mm copper...taking into account all bends etc the calculation on the existing pipework exceeds the requirement of the new boiler....yet the regulations require 22mm pipework be used on condensing combi boilers...???
Should we no longer pay any attention to pipe size calculations or do pipe size calcs still hold good and a combination of pipe sizes can be used providing the calcs hold good????????