Hi all,
I am looking for additional guidance to present to my new boss relating to a install I came across the other day, installed by our company. Not really wanting to make any waves as the new boy on the block, but also not wanting to ignore a potential problem.
The scenario is this:
A Worcester combi 42 KW pressure relieve discharging into tundish, less than 300mm before first 90, (no HepVo valve before elbow) in plastic 22mm solvent weld pipe, terminating into a sink waste, plumbed back to back with another sink waste, (waste 50mm).
Clearly me thinks umm, but the location is located 3rd story up, so termination to outside not an easy option. Seems to me a lack of planning. I have managed to find data from NHBC, but could do with any additional advice guidance.
thanks in advance.
Bill
I am looking for additional guidance to present to my new boss relating to a install I came across the other day, installed by our company. Not really wanting to make any waves as the new boy on the block, but also not wanting to ignore a potential problem.
The scenario is this:
A Worcester combi 42 KW pressure relieve discharging into tundish, less than 300mm before first 90, (no HepVo valve before elbow) in plastic 22mm solvent weld pipe, terminating into a sink waste, plumbed back to back with another sink waste, (waste 50mm).
Clearly me thinks umm, but the location is located 3rd story up, so termination to outside not an easy option. Seems to me a lack of planning. I have managed to find data from NHBC, but could do with any additional advice guidance.
thanks in advance.
Bill