B
Bodd
Combination Boiler
Hello All
Just run a near complete Heating system. all surface pipe work.
The problem is that the main is condensing. Not much I can do about this, or is there.
Of cousre the main can be lagged, where it comes down walls they are in cupbaords vetically so not a problem. But the customer intends to box in high level horizontal runs, should they lagg the main or would it be wise just to box in the pipe work unlagged.
Bod
Hello All
Just run a near complete Heating system. all surface pipe work.
The problem is that the main is condensing. Not much I can do about this, or is there.
Of cousre the main can be lagged, where it comes down walls they are in cupbaords vetically so not a problem. But the customer intends to box in high level horizontal runs, should they lagg the main or would it be wise just to box in the pipe work unlagged.
Bod