I priced for a oil boiler, unvented cylinder & oil tank install last month on a new build; UFH had been installed by a previous plumber that had ''done a bunk'' apparently so I was connecting on to that.
Got a call from the electrician, come plumber, come general builder, come tosser that had hooked me up with the job - ''The clients want you to do the job''
Well I was chuffed as I really wanted to do something other than a combi install... until.....
He said (he the electrician) had already started work on the on the 22mm cold main and various other pipework that I had quoted for in ******* JG speed fit!!!!!! And I wasn't to worry about balancing the mains supply as he just usually caps the balance supply off :thinking:
Also the Client had already cast the base for the oil tank with a 10% slope so as to tip the oil tank back & if the slope was a little steep... **please take a seat if your oftec
''we will put a sleeper under one end of tank to level it out a bit'' .. :whatchutalkingabout
bloody **** take.. At this point I had to politely tell them I was no longer interested in the job
Got a call from the electrician, come plumber, come general builder, come tosser that had hooked me up with the job - ''The clients want you to do the job''
Well I was chuffed as I really wanted to do something other than a combi install... until.....
He said (he the electrician) had already started work on the on the 22mm cold main and various other pipework that I had quoted for in ******* JG speed fit!!!!!! And I wasn't to worry about balancing the mains supply as he just usually caps the balance supply off :thinking:
Also the Client had already cast the base for the oil tank with a 10% slope so as to tip the oil tank back & if the slope was a little steep... **please take a seat if your oftec
''we will put a sleeper under one end of tank to level it out a bit'' .. :whatchutalkingabout
bloody **** take.. At this point I had to politely tell them I was no longer interested in the job