Hi guys,
Have just diagnosed and rectified a leaking hot water pipe which was under in concrete. The leak had been occuring for about a week and the concrete is still damp to touch, about 4m square is visible, rest is under kitchen tiles. Anyone know how long it will take the concrete to fully dry?
Many thanks
Have just diagnosed and rectified a leaking hot water pipe which was under in concrete. The leak had been occuring for about a week and the concrete is still damp to touch, about 4m square is visible, rest is under kitchen tiles. Anyone know how long it will take the concrete to fully dry?
Many thanks