Evening chaps.
Finishing up a job tomorrow. Using the old overflow from Kernel unit as discharge to outside.
Noticed today the two overflows from the kernel are link under the floor. Am i correct in thinking i can cap one upstand and link into the other. I.e is it acceptable to have a tee piece with a cap on the upstand on discharge. I cant see anything wrong with it?
Cheers