Hello again everyone,I know you can install the d2 pipe work discharging into soil stack via a hepvo valve either in copper or polypropylene pipe work clipped every 300mm, the issue I am checking is that the cylinder I will be installing is only 45cm away from stack and I have not found any information stating if there is a minimum distance you can discharge d2 into plastic soil stack. I am just concerned about potential water temperature distorting soil stack if it was to discharge. I know you have to allow 3metres into guttering.Advice welcomed. Thanks