the_d_o_t
Gas Engineer
hi guys, i was called out to re- establish the gas supply to a domestic ideal mexico boiler for the office block above a mechanics garage, the meter is situated in the garage below and is a u16 meter and supplies a load of gas heaters via large steel pipe, 2" plus! but i am informed that they dont use the heaters and would not mind if i took the large steel pipe and heaters off the supply and only used this meter for one strait supply from meter to boiler?
many thanks
many thanks