Just passed a job I missed out on , because I was £100.00 dearer I guess .it was done about 6 weeks
I noticed the flue was cut though the old air brick , and not cemented up the outside leaving the old vent holes , it's on the 1st floor , it's not to high to cement , so not sure why its been left ..
I noticed the flue was cut though the old air brick , and not cemented up the outside leaving the old vent holes , it's on the 1st floor , it's not to high to cement , so not sure why its been left ..