Install the app
How to install the app on iOS

Follow along with the video below to see how to install our site as a web app on your home screen.

Note: This feature may not be available in some browsers.

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

Feb 15, 2018
318
96
28
UK
Member Type
Other Tradesman
Business Name
CORGIdirect
1.jpg


2.jpg


3.jpg



Bronze Body DHW Recirculation Pump. Excellent Price. Only £77.00 Ex VAT

BUY HERE

Bronze Body DHW Recirc Pump

Model : Bronze pump BRZPUMP-C

Energy Efficiency Index: < 0.4

Power : 230V 50Hz

Structure : Single-stage Three-speed Centrifugal Pump

Type : Circulator Pump

Application : Domestic Hot Water secondary re-circulation.

Standards : CCC, CE, GS, RoHS, ISO9001: 2000

Specifications

1) Max Head: 6 m

2) Power/Speed : 100W/III, 70W/II, 55W/I

4) Pump body material: Bronze

5) Pump body length: 130mm/180mm

6) Joint type: Screw G1

7) Joint dimensions: 1 1/2" to 1" or 3/4"

8) Max system pressure= 1.0Mpa

Installations which have a long pipe run to the final hot water tap or shower may suffer from excessive

draw-off (and therefore wastage) of water that has cooled in the pipe, before the required hot water

is available. A secondary hot water circuit with circulating pump will overcome the problem, ensuring

that no water is wasted, because hot water is immediately available even from the tap furthest from

the storage point. A standard pump would fail prematurely in this application; the pump body is

bronze so that it does not react with the regularly replenished (and therefore oxygenated) water.

The bronze pump should be installed in a return loop added to the hot water supply plumbing after

the furthest tap in the circuit. The return tapping should be into the upper third of the hot water

storage tank (in order to avoid de-stratifying the tank contents). Control methods include:

  • Run the secondary re-circulation pump from the timer / programmer hot water output (least
efficient)

  • Run the secondary re-circulation pump on a cycle timer for short periods at intervals during
programmed hot water output times.

  • Run the secondary re-circulation pump from the timer / programmer hot water output, in
series with a pipe thermostat fitted to the re-circulation loop, after the last tap. The pipe

thermostat should be adjusted to 50C below the main hot water tank thermostat. (Highest

efficiency)

All pipes should be well insulated in order to minimise heat loss.

BUY HERE
 

Official Sponsors of Plumbers Talk

Similar plumbing topics

D
  • Question Question
Replies
7
Views
2K

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.