K
Koogatubac
Customer wants me to move the boiler on the opposite wall
Not much work involved really, HOWEVER, what would i need to fill in paperwork wise? Obv the benchmark is already filled in and in right im taking the boiler off.
Then connecting it back up, so the boiler will face the front than the side and then doing all my full tests as if ive installed it from new, i.e gas rate, pressures, flush, commission.
She wants it looking straight for her new kitchen
Not much work involved really, HOWEVER, what would i need to fill in paperwork wise? Obv the benchmark is already filled in and in right im taking the boiler off.
Then connecting it back up, so the boiler will face the front than the side and then doing all my full tests as if ive installed it from new, i.e gas rate, pressures, flush, commission.
She wants it looking straight for her new kitchen