System Testing.
To ensure the pipework and fittings have been inst alled correctly, whether it be on a new or extended system, it is essential that the system is checked and hydraulically wet tested. Testing should be at 2 bar for 10 minutes while checking for leaks or pressure drops and 10 bar for 10 minutes while checking for leaks or pressure drops.
This testing, combined with other relevant checks, should reveal installation problems and is regarded as good plumbing practice. However, system testing should not be regarded as a substitute for correct installation. (JG Speedfit do not recommend air testing of pipework)