Starting to doubt my self on pricing as I'm winning boiler changes but not a lot of other installs. The job I went out to has a brand new boiler installed but the heating system and controls are a bodied up a treat.
I'm pricing for
Change TRV and lock shields on 12 rads
Alter the bodge that is in at the moment as the system has 2 pumps 1 2 port valve and hot water won't bring the boiler on. So basically repipe the boiler and pipe up an s plan next to boiler.
Rewrite heating system and move the programmer so it is accessible and install a new rf stat.
The gas pipe is undersized to the boiler and hob so repipe in 28mm for about 18mtrs under a floor and through a wall.
Install a macerator for a kitchen waste and dishwasher. And running it across to the waste.
Run new hot and colds about 18mtrs to new kitchen sink and dishwasher.
The parts are just below £800+ vat and I'm pricing it for 3 1/2 days (an extra half day as it looks a bit of a pig) and I'm coming out at just below £2000!
Do you reckon that's too high?
I'm pricing for
Change TRV and lock shields on 12 rads
Alter the bodge that is in at the moment as the system has 2 pumps 1 2 port valve and hot water won't bring the boiler on. So basically repipe the boiler and pipe up an s plan next to boiler.
Rewrite heating system and move the programmer so it is accessible and install a new rf stat.
The gas pipe is undersized to the boiler and hob so repipe in 28mm for about 18mtrs under a floor and through a wall.
Install a macerator for a kitchen waste and dishwasher. And running it across to the waste.
Run new hot and colds about 18mtrs to new kitchen sink and dishwasher.
The parts are just below £800+ vat and I'm pricing it for 3 1/2 days (an extra half day as it looks a bit of a pig) and I'm coming out at just below £2000!
Do you reckon that's too high?