hi guys i have eventually confirmed i am going self employed by end of next month hopefully by end of next week. I have been asked to give a qoute with a view to further work from a property development company. The job is upgrade from back boiler to combi with 11 sets of rad valves and move 1 rad a meter. It is a stone built property with apparently 750mm stone wall for boiler to hang on, flue condensate and prv all to go through this wall. I need an idea of what you guys would charge assuming a cost of £12-1400 for materials. Pricing of flush seperate.
Thanks in advance.