Hi
I've been swapping rads in my house and during one rad swap I used the original notches on the joist to run the new flow and return pipes. In one notch both the flow and return touch and might get pressed against each other when the chipboard goes back down.
Should I open up the notch or reroute the return (left valve pipe)? Or is it ok they touch together?
I've attached photos to illustrate, last photo is a general picture of the whole setup
Thanks in advance
I've been swapping rads in my house and during one rad swap I used the original notches on the joist to run the new flow and return pipes. In one notch both the flow and return touch and might get pressed against each other when the chipboard goes back down.
Should I open up the notch or reroute the return (left valve pipe)? Or is it ok they touch together?
I've attached photos to illustrate, last photo is a general picture of the whole setup
Thanks in advance