M
MetManMark
All
We have just got a quote in for central heating (below) while we are largely happy with it I am slightly concerned that the rads are undersized. The house is listed, has solid walls, large single glazed windows, rooms that are about 15*15 feet and 2.8m high (yes I know I have mixed my units!).
What are people's thoughts? I am slightly surprised that he hadn't stipulated double rads throughout?
I have looked up the rads on the DeLonghi pages and know the BTU output. What is the best webpage to put in the room sizes to find out the required rad size? I know there are basic calculators out there but I want to factor in the fact that the windows are singly glazed etc.
cheers
Mark
We have just got a quote in for central heating (below) while we are largely happy with it I am slightly concerned that the rads are undersized. The house is listed, has solid walls, large single glazed windows, rooms that are about 15*15 feet and 2.8m high (yes I know I have mixed my units!).
What are people's thoughts? I am slightly surprised that he hadn't stipulated double rads throughout?
I have looked up the rads on the DeLonghi pages and know the BTU output. What is the best webpage to put in the room sizes to find out the required rad size? I know there are basic calculators out there but I want to factor in the fact that the windows are singly glazed etc.
cheers
Mark
- Supply and fit new Baxi Duo Tec 40KW combination boiler in ground floor store room with the flue terminating vertically through the roof tiles.
- Supply new Honeywell ST9100A Single Channel 7 Day timer.
- Supply new Honeywell Analogue Wireless Room Thermostat.
- Run a new gas supply underneith the floor boards and through to the store room.
- Supply and fit the following radiators in the rooms listed below : ( K2 = Double radiator, K1 = Single radiator)
- Dining room 600 x 1200 K2
- Lounge 600 x 1200 K2
- Ground floor hall 600 x 1200 K1
- Ground floor office (through lounge) 600 x 1000 K1
- Kitchen 600 x 1000 K1
- Store room 300 x 500 K1 (i added this as i felt it will be useful during cold weather and also help to dry washing etc)
- Bathroom 600 x 1200 Chrome Towel Rail
- Bathroom 300 x 900 K1
- Main bed (rear) 600 x 1200 K1
- Bedroom 2 (front joining main bed) 600 x 1400 K1
- Bedroom 3 (joining bathroom) 600 x 1200 K1
- Bedroom 4 (smallest) 600 x 600 K1
- 1st floor hall 600 x 600 K1
- All radiators will have Thermostatic Control Valves fitted to increase the efficiency and comfort of each room.
- Plumb-in new hot and cold supplies to bathroom, WC and kitchen sink from boiler room.
- Run new copper flow and return pipe work from boiler room to all radiators.
- Treat the new system with Sentinel X400 Cleanser to remove any dirt/soldering flux that may be in the pipe work. Finally, treat with Sentinel X100 Inhibitor to prevent the build up of iron oxide and prolong the life of major components inside the boiler.