As part of my house renovation I have decided that I will replace all the old type 11 radiators with type 21 double panel plus radiators. So the pipework for each radiator will have to be moved slightly - all the radiators are remaining in the same place.
Currently all the ceilings are exposed so all the pipework is easily accessible. To fit only the builder has said it will take 2- 2.5 days.
Does that sound reasonable? Or should I get a quote from someone else?