I'll be doing a boiler replacement with a glow worm betcom4 but customer insists I use the same hole..
I've looked at the manual for the terminal positioning and the only way round would be having the terminal extending passed the soffit and guttering with a flue clip. Opposite ge flue there is no buildings or any openings.
Appreciate your thoughts