G
gary
Hi Chaps
Today i did a system conversion to a glowworm flexicom 30cx. The client wanted to re use the old honeywell room stat, no worries, i'm thinking???
With it being the first flexicom i've fitted, it wasn't as simple as i had hoped. Not sure where i'm going wrong?
Using a connector i extended the stat wire back to the boiler (using the old power 3 core)
At the boiler took a live from incoming 240 then the switch live into R.
Removed the loop in the24v section. Installed the analog boiler clock, Appy days.......NO!
Any suggestions where i'm going wrong?
Cheers
Today i did a system conversion to a glowworm flexicom 30cx. The client wanted to re use the old honeywell room stat, no worries, i'm thinking???
With it being the first flexicom i've fitted, it wasn't as simple as i had hoped. Not sure where i'm going wrong?
Using a connector i extended the stat wire back to the boiler (using the old power 3 core)
At the boiler took a live from incoming 240 then the switch live into R.
Removed the loop in the24v section. Installed the analog boiler clock, Appy days.......NO!
Any suggestions where i'm going wrong?
Cheers