Hi, I've got a problem which I can't see a solution to, a future customer of mine wants to add a low level shower where a bath used to be, the shower tray is 1600 x 900, this would require a 40mm waste to go below the floor, but the joists are not big enough to allow a 40mm waste to be drilled (based on a allowing 25% hole size in relation to joist size), I can't see a solution, raising the tray is not an option, it's too big and would have to be too high....any ideas? The picture shows the location of the tray and you can see the old bath waste in the wall. The waste has to run under the floor where the legs are in the photo.
IMG_20210203_170830.jpg
 
Internal stack ?
What’s left and right of the picture ?

I would want a structural engineer to have a look at them houses as they look skinny
 
If no good below, run waste between joists to external wall and then around building to stack - do this in 50mm pipe internally, possibly stepping up to 110 before the stack if it’s a long way.
 

Official Sponsors of Plumbers Talk

Reply to the thread, titled "Routing new shower waste" which is posted in Showers and Wetrooms Advice on Plumbers Forums.

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.

Weekly or Monthly Email Digest

Back
Top