I have a stone resin tray to install at the weekend. The question I have is the existing flooring is 22mm T&G chipboard. Do I cut this out and put down some 18mm marine ply or just fix the marine ply on top of the existing flooring then 5:1 dry mix mortar and then lay the tray. Also would 20mm deep mortar be sufficient for the mortar base???