.so after a large delay, I've gotten around to replacing the connection into the stack (push fit Polypipe 90 degree + solvent weld straight and then push pan connector). All dead easy and working fine (result!).
See before and after pics attached.
Having pushed the 90 degree connector as far as i can into the stack connector (up to the 'shoulder' nearest the main stack) my new pan is about 30mm closer to the side wall than it was before.
My question is, does the 90 degree connector need pushing in all the way or can it be part inserted...so I can get my 30mm back. This would give me a 380mm centre to the side wall.
Or...do I need to insert straight piece of pipe into the stack and then a double socket bend (can only see 92.5 deg), to give me the distance I want?
Thanks.
Nige
See before and after pics attached.
Having pushed the 90 degree connector as far as i can into the stack connector (up to the 'shoulder' nearest the main stack) my new pan is about 30mm closer to the side wall than it was before.
My question is, does the 90 degree connector need pushing in all the way or can it be part inserted...so I can get my 30mm back. This would give me a 380mm centre to the side wall.
Or...do I need to insert straight piece of pipe into the stack and then a double socket bend (can only see 92.5 deg), to give me the distance I want?
Thanks.
Nige