Looking for a solution here, anyone any ideas?
We've got a cllent that has a combi boiler that can't take pre-heated water, no room in the property for a new unvented cylinder so can't convert the combi to a system boiler, and we've got a vented thermal store that gets intermittently heated from a solar source.
We only want to use the thermal store for DHW as there isn't enough input into it for space heating, and it won't be hot all the time and has a limited heat input.
We are happy to have blended water out at 48° as there is no store of heated water legionella and G3 are not an issue.
So - how can we taken the heat out of the thermal store to heat up the incoming water for DHW and when that runs out switch over to the combi?
Here's what one of our apprentices has come up with, can anyone else suggest a better way to manage to possible sources of DHW one which is finite, and what other controls are missing?
Obviously needs a check valve on the incoming mains supply
And considering using a Gledhill GT152 pump controller instead of the simple on/off stat for better control - better ones?
I can see a couple of challenges with this set up - what would you guys suggest?

We've got a cllent that has a combi boiler that can't take pre-heated water, no room in the property for a new unvented cylinder so can't convert the combi to a system boiler, and we've got a vented thermal store that gets intermittently heated from a solar source.
We only want to use the thermal store for DHW as there isn't enough input into it for space heating, and it won't be hot all the time and has a limited heat input.
We are happy to have blended water out at 48° as there is no store of heated water legionella and G3 are not an issue.
So - how can we taken the heat out of the thermal store to heat up the incoming water for DHW and when that runs out switch over to the combi?
Here's what one of our apprentices has come up with, can anyone else suggest a better way to manage to possible sources of DHW one which is finite, and what other controls are missing?
"The tank top stat will control S1 & S2. If the tank is above the stat value ( 48c ) then S1 opens and heats the HEX, if below...S2 open and the boilers fires. There is a flow switch where DHW is on the drawing which is a live feed to the stat...then DHW. Both valves are normally closed.
Valves will be potable solenoid valves (not 2 port C/H valves)
"Blending" valve will be a standard TMV"
Obviously needs a check valve on the incoming mains supply
And considering using a Gledhill GT152 pump controller instead of the simple on/off stat for better control - better ones?
I can see a couple of challenges with this set up - what would you guys suggest?