scratching my head a bit. ive got a plumber fitting a rm stelflow 250l with twin immersions. my idea is to feed the top one first then the bottom one once the top one has tripped its stat setting. the problem is most stats seem to have only normally closed contacts, I need normally open. one idea I had was to feed a contactor from the top immersion, but that wont work as the supply to the immersion will be pulsed from the pv diverter. could I leave the thermal cut out in series with the top immersion and then use the top immersions stat to control the contactor? or is this a safety risk?