Hi I'm have a new central heating system New boiler / pressurized Cylinder 210 new mdpe main 25 mm its being done soonish ( plumbers busy at the mo )
how much more effort is needed to add a nest system or similar and what is entailed ? do you need new rad valves sensors etc. and could it be added retrospect or needs to be thought about whilst fitting new system
Ps old system was / is a Gravity fed one 50 Gallon tank and Copper cylinder which is going
Cheers
how much more effort is needed to add a nest system or similar and what is entailed ? do you need new rad valves sensors etc. and could it be added retrospect or needs to be thought about whilst fitting new system
Ps old system was / is a Gravity fed one 50 Gallon tank and Copper cylinder which is going
Cheers