S
so-solar
Customer has contacted me to quote for ripping out open vent system and boiler and replace with 18i worcester and a megaflo, The only issue is she wants me to keep the 1 pipe system that is already installed as she has just revamped the whole house, the system has 10 rads and is still up and running!
Where do i stand with current regulations on this matter?
Has anybody pressurised a 1 pipe system in this way?
Where do i stand with current regulations on this matter?
Has anybody pressurised a 1 pipe system in this way?