Hi all, ive installed a fair few ufh systems now, all of which are onto oil boilers. Im starting a ashp system next week and was wonderimg how you all loop the pipe to 150mm centers. So far ww have hand formed the loops to 200mm centers but im not confidend of hand forming beyond that!! Does anyone one have a tool ir tricks thry use??