Discuss New build in copper in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
Messages
910
Hi has anyone got much experience of doing new builds in copper? Got some to do there traditional joist not the engineered ones.
 
Thanks ones I have worked on have all been plastic as I am relatively new to plumbing. When notching the the areas allowed it it usually to do one longish notch and run the heating and the hot and cold pipework in that?
 
New build shouldnt be notched, should be drilled through the neutral axis of the joist. LABC up here are really hot on it.
 
I have seen it done before were they did a notch for all 4 pipes and put hair felt under and over the top of the pipes. Two central heating pipes then the hot and cold water.
 
Just because its been done before doesn't mean it is the correct way, I would keep the cold away from all hot pipes as far as possible
 
It might be possible to drill the joists very accurately and run copper through them. Need to be accurately lined up with a chalk line or laser & measured plumb down to centre exactly on each joist. Obviously any other pipes running parallel with joists are no problem. Holes need to be plenty big.
If it is a concrete block wall new build, then just a matter of drilling holes bigger than the pipes diameter & temporary sleeving to push the copper through. But you might find some rooms joists are running opposite direction to others & this will enable you to simply push copper pipes in from room that has joists running same way, through the other joists you drill, if you know what I mean. I have done some like this. Nothing is impossible.
 
Last edited:
lets be honest if your on a price your going to have to cir saw a big notch and bang the pipework in. I would try and keep the cold closest the wall in its own notch if you can but its new build and the pay is peanuts so sometimes you give them a monkey.
 
Pipes set 3 or 4 inches apart will not only prevent heat transfer, - they are also so handy to solder, they are also easier to bend pipes to tee into them.
 
Status
Not open for further replies.

Reply to New build in copper in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi could anyone give advice please ? I went to look at a new build for sale they are apartments/ one house on top of another all properties will...
Replies
3
Views
477
Hi what is a rough guide cost for labour only in a typical 4 bed house new build in england Air source heat pump with Unvented cylinder...
Replies
3
Views
647
Hi all. New to this. I Will Try and explain best I can. Large New build (2.5yrs old) with block and beam flooring. Then Membrane Then celotex...
Replies
2
Views
822
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16...
Replies
0
Views
284
How safe are flexi pipes my toilet cistern has one it was changed about a year ago when the toilet was removed for some work to the bathroom...
Replies
3
Views
559

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock