Search the forum,

Discuss Regs on programmable stats etc in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.

Hobo128

Gas Engineer
Messages
302
Pricing up a job to put a worcedter 25i in a property. In thd past I have alway fitted trvs to all rads except one where I have put a room stat in. In this case the customer doesn't want a room stat, he just wants it really straight forward. I'm thinking of putting trvs on all rads and fitting a mechanical clock instead of a programmable stat that he will struggle to use. Is this abiding by the regulations or does it not matter.
 
so how will you comply with building regs in providing a boiler interlock, that you are going to sign off as being compliant........... just stick a rotating rm stat on the wall, which he will then turn on and off and have a mechancal timer on or near the boiler, you doing it right and he will be happy
 
Last edited by a moderator:
Status
Not open for further replies.

Reply to Regs on programmable stats etc in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi all I'm hoping someone can shine a light on this for me Since our stop tap on the pavement has now been filled with sand for whatever reason...
Replies
3
Views
307
We are from Alberta, and I own an electrical company. I have been asked by a BC Mechanical P. Eng. to install an emergency STOP button at the...
Replies
5
Views
309
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4...
Replies
9
Views
414
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock