Flexible couplings everywhere?
Perhaps thats how things might be in SOME houses but I always think flexi's are the lazy way to do things and can assure you, that my house has no flexi's whatsoever - and no plastic rubbish either.
Al joints are sweated where possible and rigid copper used...
Simple. They dont.
Safer for them to call us if pressure drops than to trust them to understand how & when to re-pressurise the system plus it would be wiser to check why, should the pressure drop BUT CH engineer can check the pressure annually when carrying out safety check.
As long as the...
I am the landlord of a rental and the filling loop was left connected and with one of the valves left open.
Tenant had emergency when braided hose ruptured and flooded the kitchen whist she was out.
Plumber that did the Gas Safety check earned another £60+ for a call out and tenant had blown...
If you are qualified to do a Gas Safety check on a property I assume that entails checking the boiler.
If, when checking a Combi, you notice the flexi filling loop in place (Taps closed) would you remove it or leave it be?
Also if you notice one valve open and the other closed, once again, would...
I have now added a few pics.
Here is the tank still in the loft with all pipes remaining and the cupboard we intend using for storage where the the old tank was.
Anyone still following this might like to see some of the end result of the job I had done.
This is after receiving a text to say all complete.
Can I have the rest of my money now please (£400)
I hope he knows how to sing.
Ah Ok thanks for that.
He did inform me that the materials would be around £2500 which we paid up front but I think that might have been a bit top heavy.
Then again I am used to buying a Main 35 (10yrs back) for around £6 - £800 but I think that might be a trite low these days.:)
There are many faults but like I said lots of this wil be corrected when the other trades have been & gone
The guys an idiot so NOPE he is not crossing my threshold again.
I was asking re the tanks & remaining pipework as I will be furnishing Trading Standards with a breakdown of the issues I...
The boards that were rendered unusable were subsequently replaced with board that were approx 1cm too narrow (He reckons I was being too fussy as the carpet covers them anyway lol)