have a quote of £1250 to:
Remove existing cylinder
Alter pipework from boiler to new cylinder
Reroute cold main to cyl position
Supply&fit rm 250ltr pressurised cyl
Fully pump heating system
Supply&fit wireless heating controls
Reroute bathroom rad pipework into bedroom rad
current setup...
Hi guys received a phone call today, customer said his stopcock leaks when turned on/off.
Said I can go and have a look tomorrow to repair/replace. He said to just replace it.
Water can be turned off from the street. apparently.
Stopcock is under the floor just inside the front door, so is...
Anybody bought GTEC Aqua boards recently??
What price did you pay?
I picked up 4 boards from jacksons thinking I was doing the right thing by fitting them in a shower area. In hindsight I shouldn't have bothered and will learn from my mistake, honest. Jacksons building supplies sent me an...
Hello
What would be fair price to pay subbies i was thinking 40% labour
i pay all google ads, leaflets, newspaper ad etc costs myself and all admin )
for:
system chemical flush
system to combi upgrade
install vertical flue
install rads
power flush
trv installation
install...
I did put a thread up earlier about fitting rads for 18pound each on price. I snubbed it, turns out i went back with agency on day rate. On my day rate i would of already earned a grand this week already and its only thrusday. On monday i am going on price but its First fix 500 a flat.
It is...
Does anyone know a brickie? Or can recommend a forum like ours, I need a ballpark price for labour for building a wall approx 390m long by 2m high, I appreciate there are a 100 variables but very rough £/m2 wood do me at the moment
Ta
Hi i am new to this forum, I have been a plumber for around 8 years and i am getting pretty sick and tired of it to be honest. The last job i was at wanted to pay price £15 per tail rail and £18 per rad. For this you needed to get your own public liability insurance. First few i fitted i had to...
hey all,
someone i know has just had a boiler install for absolute peanuts that will make you feel sick if you know the price...
am i allowed to say how much?
(done by gas safe engineer including power flush...)
I have just fitted 9 TRV's for a friend which took 3 hours. He supplied all the valves and also a bottle of inhibitor which i put in the system after.
I dont usually do jobs on my own so im wondering what people would charge themselves roughly? Price includes, draining system, fitting valves...
Hi guys
My girlfriend just got a text from a workmate of hers saying would I be able to change a pressure valve on their heating system. I assume she means PRV. I also know they might not know what they are talking about and it might not be a PRV that needs changing.
It's a 10 mile drive to...
Hi All
I wonder if you can help me with tube prices - I have been getting a lot of contradictory pricing signals lately - perhaps not surprising because the London metal exchange has been a bit bouncy in the last few months.
I am looking for the following information:
The price, excluding...
Hi, I am sorry if there were similar posts before but I believe mine is a bit more complex. I just got a job offer, one of those you don't get too often, basically it's about stripping and replacing 8 bathrooms, entire pipe work (water+waste) and radiators (no work with gas involved) in a small...
Hi just a quick question: Why is the price of the gas in England billed in Kwh? surely would be easier to billed it how is read on the meter nowadays mean cubic meters, instead of making calculation related to calorific value of different stock of gas.
I think myself that system it is not for...
back in april had a few quiet weeks and my phone was not ringing at all the quiet spell where you start to get a bit of a panic on .
So my dad put me in contact with someone he knew about pricing a boiler change .
Visited site put a price in which included chemical clean cust stated dont want...
Hi guys just reading through a lot of threads and one thing that keeps coming up is pricing up work.
I'm not doing my own private work yet but getting a good idea from the forum how to go about pricing up certain jobs.
One thing I will always do is have a look at a job before giving a price...
Just got a Worcester Bosch 29cdi with telescopic flue and rf stat for 1180 inc vat.
Does anyone get much of a better price and where from. This was from a local merchant