
This is coming out tomorrow. New boiler has been hung and pipework has been run. Tomorrow will be the drain down and connect up. What needs doing with these pipes?, the flow i know just needs connecting to the new flow I have run so that's simple enough. Got the other 2 pipes joined together. Boss reckons the one with the pump will be our return, the other will be capped. Right or wrong i don't know but i don't want to be working any later tomorrow night than i have to.
I have never seen anything like this beast.