I got a price for fitting a new boiler but would just like opinions on whether it's about right. The new boiler will be a wall mounted Vitoden 100 30Kw, the work involves;-
1) cut off the gas supply at the outside meter to the existing floor standing boiler in the kitchen.
2) run 12m of new pipe from the meter around three outside walls & through into the utility room.
3) supply boiler & RF (what is this?)
4) Fit boiler on wall, cut core through wall for the flue (CH & H&C tails poking through the ceiling)
5) connect condensate pipe to existing low level waste pipe
6) connect to nearby ring main spur
7) flush the existing system
The pipe runs to the new boiler position are all in place, time allowance given is 1 day for two guys, £1800 cash.
Is this about right and does it sound like a good inclusive spec? Should I be including a room stat or anything else?
1) cut off the gas supply at the outside meter to the existing floor standing boiler in the kitchen.
2) run 12m of new pipe from the meter around three outside walls & through into the utility room.
3) supply boiler & RF (what is this?)
4) Fit boiler on wall, cut core through wall for the flue (CH & H&C tails poking through the ceiling)
5) connect condensate pipe to existing low level waste pipe
6) connect to nearby ring main spur
7) flush the existing system
The pipe runs to the new boiler position are all in place, time allowance given is 1 day for two guys, £1800 cash.
Is this about right and does it sound like a good inclusive spec? Should I be including a room stat or anything else?