G
Gerard17
I went to do a little job for sum1 I didn't no the person he got my number from sum1. The job got bigger an bigger an b4 I knew it I fitted a toilet basin electric shower repiped towel rail in chrome moved a radiator in another room and changed his stopcock. This was over about a 3 month period as he was tiling the bathroom after he finished work. I spent about £50 on materials an billed him £525. I went there about 6 times in total. An he has just rang me to say he thought the bill was to high. I no I should of quoted him but it was 1 of them a little job turned into a whole bathroom. He's now asking me to break the quote down.
any thoughts?
any thoughts?