Installing 2 amptec electric boilers and have installed with increased pipe work as instructed. But do i need to install the flow coming from one direction and the return coming from the opposite. In the following link on page 9 it suggests that the flow and return come in from separate sides. https://www.heatraesadia.com/-/medi...lation-manuals/amptec-installation-manual.pdf
Is this essential to ensure equal flow through both boilers or am i ok to have the flow and return coming from the same side/direction with larger sized pipe work on both flow and return before getting to the boiler?
Thanks in advance